BGE-02
Canal bridge design using pre-stressed concrete girder.
Bridge engineering and girder analysis.
Project of the temperature-controlled aircraft parts storage facility.
Building Systems Improvement for the Commercial Concession Areas
Post-tensioned slab design for institutional office structure.
Post-tensioned slab analysis for school recreation facility.
Office structure designed with post-tensioned slabs.